Next: Plot results with GID
Up: Basic information
Previous: Distribution files and installation
  Contents
- Choose in GID data then Project type.
Choose tochnog.
- Generate geometries in GID.
- Assign conditions.
This will later be used to generate bounda_unknown and bounda_time records for Tochnog.
- Assign materials.
This will later be used to generate group_type records and element_group records for Tochnog.
- Generate a mesh in GID.
Use GID generation and generate to get a mesh.
Use GID generation and mesh view to see the mesh.
This will later be used to generate element and node records for Tochnog.
- Use Save as... in the File menu to save to a problemname.gid
directory (choose problemname something to match your problem, e.g. beam or so).
- Use the GID calculate menu to start the calculation.
The above data will be written to the problemname.gid/problemname.dat file.
So, other data then above will not be written to the problemname.gid/problemname.dat file,
and the gid calculate wil not start a real calculation.
You should finish the file with an editor and then run tochnog in the usual way.
Next: Plot results with GID
Up: Basic information
Previous: Distribution files and installation
  Contents
tochnog
2001-09-02